LIST OF ANNEXURES

 

No.

Particulars of Item

Para Ref.

2.1

Method of applying adjustment at front tower of tamping machine on curve

2.2.2.2 (1)

4.1

Speed restrictions

4.9 (iv)

4.2

Infringement of maximum and minimum dimensions

4.9 (v)

4.3

Infringements of Schedule of Dimensions-1939 of various track machines in use over Indian Railways

4.10

5.1

List of important items to be specially checked by inspecting officials of track machine organisation

5.3.4

5.2

Aspects of machine working to be looked for by inspecting officers of division.

5.3.4

5.3

Guidelines for operation of tamping machine in design mode

5.4.2

5.4

Sequences of tamping

5.5.2 (vi)

5.5

Format for log book to be maintained by track machine control

5.7.2

5.6

Daily progress report-cum-logbook

5.7.3 (I) (ii)

5.7

Breakdown report of track machine

5.7.3 (I) (iii)

5.8

Availability of track machine

5.7.3 (I) (vi)

5.9

Procedure for calculation of unit cost of working of different track machine

5.7.4 (I) (v)

6.1

Activity flow chart for POH of tamping machine

6.3.1

6.2

Typical facilities of POH and IOH workshops to overhaul 24 machines and 100 tamping unitsperyear

6.3.1 & 6.3.2

8.1

Weightage factors for track machines and yardsticks for staff

8.2.2 & 8.2.3

8.2

Layout of workshop-cum-rest van for track machines

8.4.5

 